Research on Problems of Steam Drum Liquid Level Control of Evaporative Cooler for Heating Furnace 加热炉汽化冷却装置汽包液位控制问题研究
Manufacture of granulated caustic soda drum cooler 转鼓粒碱冷却器的制造
For balancing the capacity between the old and new systems, a gas mixing drum was installed downstream of indirect cooler for the new system and packed tower for the old one. 为了使新旧两系列能均衡生产,在新净化系列的间冷器出口和老净化系列的填料塔出口设置了混气包。